Plans for future cleanups and room rearrangements
- Move all retired boxes to the loft and build them into a neat 'wall'
- Triage and dump the stack of Suns under the desk closest to the machine room
- Throw out at least half of the keyboards in the box and in the cupboards
- Triage and dump as necessary the DEC and other gear upstairs in the loft
- Triage and neatening of left-hand set of shelves
- Pigeon hole cleanup
- Get all the crap off the top of the machine room and dust
- Tidy up the bookshelves, box anything that looks to have sentimental value
- Clean under the snack machine, it's a warzone under there
Machine Room
- Power on left-hand racks needs cleaning up
- Any cords that we have to step over to get behind the racks need to be moved to better locations
- Replace failed light globe
- Page.execute = 0.009s
- base__init__ = 0.072s
- getACL = 0.012s
- i18n_init = 0.000s
- load_multi_cfg = 0.000s
- run = 0.145s
- send_page = 0.129s
- send_page_content = 0.031s
- total = 0.218s