Plans for future cleanups and room rearrangements
- Triage and dump the stack of Suns under the desk closest to the machine room
- Triage and dump the billions of keyboards in the keyboard drawer in the main corridor
- Triage and dump as necessary the DEC and other gear upstairs in the loft
Deal with the shelving!
- Some suggestions have been made that we stack the shelving with the long edges touching, rather than the short edges. Blocked by the lack of tidy arrangements.
Machine Room
- Mermaid: is only running the dispense server. This could be moved to Mussel or Martello, and the machine decommissioned.
- Coax network: the DEC coax repeater in the rack can go. We need a 10baseT AUI module for the DECserver on the desk (which runs the door sensors and lock).
- Manbo: there are plans by various wheel group members to move data storage for /away and /services off Manbo and onto Musundo, the much faster Solaris machine in the machine room. If this happens, Manbo can be moved offsite (where to?) and used via remote access.
- Morwong: this machine helps keep the LAT network stable, and runs [TRS]' screen session. Several people have suggested that we decommission it; these people have met with mysterious horrifying accidents.