Differences between revisions 7 and 8
Revision 7 as of 2009-12-23 14:49:50
Size: 1278
Editor: localhost
Comment: converted to 1.6 markup
Revision 8 as of 2010-01-15 00:16:46
Size: 844
Editor: BobAdamson
Comment: this is never going to be looked at again is it?...
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * Move all retired boxes to the loft and build them into a neat 'wall'
Line 4: Line 4:
 * Triage and dump the billions of keyboards in the keyboard drawer in the main corridor  * Throw out at least half of the keyboards in the box and in the cupboards
Line 6: Line 6:

Deal with the shelving!
 * Some suggestions have been made that we stack the shelving with the long edges touching, rather than the short edges. Blocked by the lack of tidy arrangements.
 * Triage and neatening of left-hand set of shelves
 * Pigeon hole cleanup
 * Get all the crap off the top of the machine room and dust
 * Tidy up the bookshelves, box anything that looks to have sentimental value
 * Clean under the snack machine, it's a warzone under there
Line 11: Line 13:
 * Mermaid: is only running the dispense server. This could be moved to Mussel or Martello, and the machine decommissioned.
 * Coax network: the DEC coax repeater in the rack can go. We need a 10baseT AUI module for the DECserver on the desk (which runs the door sensors and lock).
 * Manbo: there are plans by various wheel group members to move data storage for /away and /services off Manbo and onto Musundo, the much faster Solaris machine in the machine room. If this happens, Manbo can be moved offsite (where to?) and used via remote access.
 * Morwong: this machine helps keep the LAT network stable, and runs [TRS]' screen session. Several people have suggested that we decommission it; these people have met with mysterious horrifying accidents.
 * Power on left-hand racks needs cleaning up
 * Any cords that we have to step over to get behind the racks need to be moved to better locations
 * Replace failed light globe

Plans for future cleanups and room rearrangements

  • Move all retired boxes to the loft and build them into a neat 'wall'
  • Triage and dump the stack of Suns under the desk closest to the machine room
  • Throw out at least half of the keyboards in the box and in the cupboards
  • Triage and dump as necessary the DEC and other gear upstairs in the loft
  • Triage and neatening of left-hand set of shelves
  • Pigeon hole cleanup
  • Get all the crap off the top of the machine room and dust
  • Tidy up the bookshelves, box anything that looks to have sentimental value
  • Clean under the snack machine, it's a warzone under there

Machine Room

  • Power on left-hand racks needs cleaning up
  • Any cords that we have to step over to get behind the racks need to be moved to better locations
  • Replace failed light globe